Permission for the following works;
1. Removal of five double-length pews and one short pew in both the North and South transcripts including the lowering of the existing timber raised floor such that the finished level of the timber floor lines through with the existing terrazzo floor, to accommodate liturgical and accessibility requirements;
2. Removal of the first forward-facing pew in the nave, the removal of the existing choir stalls and the pew stall front and side including the lowering of the existing timber raised floor such that the finished level of the timber floor lines through with the existing terrazzo floor, to accommodate liturgical and accessibility requirements;
3. The insertion under the existing balcony at the rear of the nave of a Parish Record Store and a hospitality area including the lowering of the existing timber raised floor such that the finished level of the timber lines through with the existing terrazzo floor to accommodate accessibility requirements;
4. The complete removal of the existing semi-basement boiler house located external to the original footprint of the church in the west corner of the junction of the south transcept and replacement of existing heating system in the church;
5. Provision of Life Systems within the church- fire detection & alarm and emergency lighting;
6. Provision of lighting protection to the external fabric of the church;
7. Internal decoration.

To find out more details on this Church & Community Development in Dublin Granted permission on 2021-05-28 take the free trial here.


Stage:
Plans Granted