Strategic Housing Development

The development will consist of:

i. The construction of 575 No. residential units, all with private amenity space, with a cumulative Gross Floor Area of 60,326.9 square meters comprising:
a. 43 No. 2-bedroom, 2-storey houses and associated amenities and car
parking;
b. 270 No. 3-bedroom, 2-storey houses and associated amenities and car parking;
c. 45 No. 4-bedroom, 2-storey houses and associated amenities and car parking;
d. 30 No. 4-bedroom, 3-storey houses and associated amenities and car parking;
e. 3 No. apartment blocks ranging in height from 3-5 storeys providing for;
i. 20 No. 1-bedroom apartment units with all associated amenities and car parking; and,
ii. 46 No. 2-bedroom apartment units with all associated amenities and car parking;
f. 121 No. duplex and corner block units 3-storeys in height providing for;
i. 15 No. 1-bedroom duplex units with all associated amenities and car parking;
ii. 21 No. 2-bedroom duplex units with all associated amenities and car parking;
iii. 6 No. 3-bedroom duplex units with all associated amenities and car parking;
iv. 29 No. 1-bedroom corner block units with all associated amenities and car parking;
v. 42 No. 2-bedroom corner block units with all associated amenities and car parking; and,
vi. 8 No. 3-bedroom corner block units with all associated amenities and car parking.
ii. The construction of a creche with a gross floor area of 623 square metres, an associated external play area and 14 No. car parking spaces;
iii. The provision of 314 No. bicycle parking spaces incorporating 163 No. longterm bicycle parking spaces and 151 No. short-term bicycle parking spaces;
iv. New boundary walls and fences, open space, internal site roads, pavements, public lighting, tree planting, bin storage, ESB substations and all ancillary works;
v. Provision of new GAA changing room facilities with a Gross Floor area of 97 square meters, associated entrance road and 40 No. car parking spaces;
vi. The erection of 2 No. 13m lattice masts in the southern section of the site
together with the relocation underground of 2 No. 10kV and 2 No. 38kV
overhead lines;
vii. Infrastructure works including:

o Surface Water – Surface water from the northern site will be discharged into 1 No. detention basin to the south of the proposed development site. Surface water from the southern site will be discharged into a detention basin to the southeast of the development site.
o SUDS measures such as permeable paving, swales, filter trenches etc. will be provided to intercept and provide treatment to surfacewater run-off at source.

An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and are submitted with the application documents.

To find out more details on this Residential Development in Meath Applied for on 2020-01-08 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Meath


Address:
Newtownmoyaghy

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL