Retention of Block C – 1 single storey detached temporary accommodation structure located to the south of the site, consisting of 2 classrooms, 1 home economics room, 1 art room, associated access ramps/steps & fencing, connection to existing foul and storm sewers and Permission for the following:
(a) Block D – 1 two storey detached temporary accommodation structure located to the south of the site, consisting of 7 classrooms, 1 science classroom, 1 technology room and toilet blocks with connection to the existing foul and storm water drainage;
(b) conversion of a classroom within existing Block A to form a store and an access corridor and to the proposed Block D together with a covered walkway between existing Block A and proposed Block D;
(c) Block E – 1 single storey detached temporary accommodation structure located to the south of the site containing 1 office with connection to the existing storm drainage;
(d) additional car parking located to the north west of the site and (e) all associated site works.
Tender:
Colaiste Cois Life, Castle Road, Lucan, Co. Dublin. 810 sqm of Temporary Accommodation to be delivered in 3 phases. Phase 1a & 1b (2017) and Phase 2 (2018)
To find out more details on this School Development in Dublin Started on 13th August 2017 take the free trial here.