(1) Demolition of front single-storey entrance building and rear storage area; removal of trees to facilitate vehicular entrance, road and associated site preparation work;
(2) 630sq. M. Two storey front entrance building including cafe and office space with flat roof and building signage; 206sq. M. Single storey dispatch fridge with flat roof, level loading dock and canopy complete with associated plant;
(3) Roller shutter door and canopy and pedestrian doors to existing building;
(4) Enclosed bin store;
(5) Reorganisation of parking to provide 49 total parking spaces; (6) Enlargement of the existing side plant enclosure;
(7) All associated site, civil, drainage and landscaping works required for the construction and usage of the proposed building.

To find out more details on this Factory Development in Dublin Applied for on 2019-03-22 take the free trial here.


Address:
Unit E20 Cloverhill Industrial Estate

Stage:
Plans Applied