1) Demolition/removal of: an ESB substation (approx. 64sqm); 2 no. sheds (approx. 10sqm each); cladding on northern, eastern and southern elevations and roof of the existing warehouse; the east boundary wall, fencing and entrance gates; and the south boundary wall towards the west corner site. 2) Alterations to the existing warehouse (approx. 1,242sqm) with an overall height of approx. 13.3 ( 60.70m OD) to provide a service garage and associated ancillary elements (with overall area of approx. 1,492 sq.m including internal plant), comprising: (a) External works including: recladding of north, south, east and west elevations of warehouse; provision of a new pitched roof with 9 no. west facing roof lights (there will be no change tot eh overall height of the existing warehouse); and provision of a vehicular service entrance, a pre-NCT service entrance , trade counter entrance, parts drop entrance and emergency exit. (b) Internal alterations including: revised internal layout at ground floor level to provide a services garage workshop configuration, associated tool and waste storage areas, customer areas and associates ancillary office accommodation. (c) Additional floor area: the internal works include new floor area at first floor level (approx. 250sqm floor area including approx. 64sqm internal plant area) to provide associated ancillary office accommodation and staff facilities. 3) The proposal also comprises: modification of existing vehicular entrance arrangements including the provision of a sliding gate (approx.. 8m wide) and an automatic barrier; reopening and modification of a disused entrance to provide a vehicle delivery entrance and gate (approx.. 3m wide); provision of a fire escape access gate (approx. 1m wide) at the northern most end of the eastern boundary; revised boundary treatments (including a new eastern boundary wall with metal railing, a partial new southern & northern boundary wall and new concrete coping on the existing western boundary wall); provision of 12 no. parking spaces (customer, disabled & staff); 26 no. bays for service/loan vehicles; 2 no. vehicle charging points; 3 no. vehicle display podiums; bicycle parking; an enclosed waste compound ; a valet compound ( including2 no. covered vehicle wash bays and 2no. enclosed valet bays); 1 no. doubled sided totem sign a the main vehicular entrance; 4 no. signs on southern façade of the service garage, within the forecourt and at the site boundaries; provision of landscaping treatments; new foul sewer arrangements ( including a connection from the Killeen Road to the public network at the Nangor Road (also referred to as the New Nangor Road) and new surface water drainage arrangements including attenuation and a petrol/oil interceptor and all associated site development works.

To find out more details on this Light Industrial Development in Dublin Granted permission on 2016-12-19 take the free trial here.


Address:
The Former Smurfit Kappa Warehouse Site

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL