The proposed development comprises site clearance and leveling works, including the demolition of all existing building(s) on site and the construction of a new Aparthotel building that ranges in height between 3 and 7-storeys above two lower ground levels (along the southern part of site) to provide a total Gross Floor Area (GFA) of 6,346.8 sq.m, including ancillary staff and guest facilities, plant, storage and waste/ refuse storage areas and a minimum of 15 no. bicycle parking spaces. An ESB sub-station is proposed at ground floor level at the south-eastern corner of the proposed building. Guest/ pedestrian access is provided along the southern frontage onto James Street leading into the reception area with ancillary Café at ground floor. A combination of hard and soft landscaping measures are proposed along all elevations to enhance areas of public realm and ancillary amenity spaces. The proposed building includes for the provision of sustainable drainage measures together with the provision of green roofs.

To find out more details on this Hotel & Guesthouse Development in Dublin Granted permission on 2017-10-04 take the free trial here.


Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL