For works to the former APW building in Deerpark Industrial Estate. For the following: (1)Proposed external works, these will include the erection of a new water storage and associated pump house to the south-west corner of the site and external plant equipment with fence enclosures to perimeter of the building; (2) Proposed intake extension, a double height extension with dock door to the east elevation, with a proposed area of 180sqm; (3) Proposed dock door, a new dock door is proposed to be erected to the east elevation with an area of 10sqm (4) Proposed compressor room, a two storey extension to the existing front (north) elevation with an area of 192sqm; (5) Proposed services and storage areas; a two storey extension to the existing front (north) elevation with services area on ground floor and storage area at first floor with a total area of 666sqm (6) Proposed warehouse extension; a double height extension with 2 no. dock doors to the west elevation with a new vehicular access.

To find out more details on this Factory Development in Galway Started on 2015-07-30 take the free trial here.


Address:
Oranmore

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL