(a) Development of a new office facility comprising 1 no. Office building containing 4 no. Three storeys linked office blocks, central entrance/reception with central dining room, commercial kitchen and external refuse storage area. (b) Security gate house, barriers and security gates to the existing site access road, extend the existing road from site entrance into new car parking to front and rear of building with external circulation around the building accessing the car parking including a ramp to the rear service area. (c) Formation of new vehicular entrance for emergency vehicles with security gates from existing IDA Link Road. (d) 2 no. Service buildings each containing a generator, ups and boiler house. (e) Provision of pump house at the attenuation lake. (f) 2 no. LPG tanks and compound fencing. (g) Connection to existing foul sewerage system and storm water drainage system via an attenuation lake located to the south of the proposed building with final discharge into an existing storm drain.
To find out more details on this Office Development in Donegal Granted permission on 3rd September 2020 take the free trial here.