The development will comprise of: the demolition of an existing two-storey storage building (345 sq.m); the construction of a new 4-storey office and training centre building (776. 5 sq.m) with associated toilets, internal circulation including shared stairway and lift and roof mounted solar panels; alterations to plans and elevations of the existing rear 2-storey hair academy building incorporating new fire exits located at the rear of the site; connection to existing site services; alterations to site boundaries and ancillary site development works. The new building will comprise as follows: 8 bicycle stands and external amenity space; 181 sq.m of entrance foyer, offices and training centre with associated signage at ground floor level incorporating a pedestrian link; 198.5 sq.m of offices and training centre at first floor level; 198.5 sq.m of offices and training centre to the second floor; 198.5 sq.m of offices and training centre at third floor level. The proposed building is set back a minimum of 8m from the existing water edge to the Camac River edge along the north site boundary.

To find out more details on this Office Development in Dublin Started on 2017-04-19 take the free trial here.


Address:
Rear Of 26-29

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL