The proposed development comprises the demolition of all existing buildings on site and the construction of a new part 4-, part 5- and part 6-storey building above basement level with a total gross floor area (gfa) of 9,401. 05 sq. M, to include 264. 97 sq. M (gfa) of indoor market hall / retail floorspace and 1,251. 07 sq. M (gfa) of office floorspace at ground floor level with a further 7,885. 01 sq. M (gfa) of office floorspace on the upper levels (first to fifth floors). An esb sub-station and switch room is proposed at ground floor level at the rear of the building fronting mill street. Access to the basement car park is provided via a ramp off mill street. A total of 17 car parking spaces are proposed at basement level together with ancillary storage areas and plant are also provided at basement level. A total of 96 bicycle parking spaces and shower and changing facilities are provided at ground floor level. A north facing roof terrace is proposed at 4th floor level.

To find out more details on this Retail Development in Dublin Started on 4th March 2019 take the free trial here.


Address:
No. 8

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL