For demolition of a 1108sq.m single storey maturation building. Planning permission was previously granted (P.A. Reg. Ref:13900045) for works on the site including the removal of 22 large maturation vessels which are currently supported by this structure. The current use of subject site is subject to an industrial emissions licence (Reg. No. P0448-01). The subject site extends to C.3.na. and is part of a larger C.4.2 ha landholding at this location. The overall landholding includes a number of national monuments and two protected structures comprising no. 44 Parliament Street (Diageo Visitor Centre) and the adjacent segmental-headed carriageway/gateway. This planning application does not propose any alteration to or interference with those monuments/structures and the proposed works relate only to works above the existing ground level and no excavations below the existing ground levels are proposed.

To find out more details on this Factory Development in Kilkenny take the free trial here.


Address:
St Francis Abbery Brewery

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL