Development of an aparthotel on a site of c.0.1787 hectares. The proposed development will consist of the demolition of existing part single/ part 2-storey commercial buildings (1,400.2 sq.m gross floor area) and the development of a part 5 (with fourth floor level setbacks) and part 7 storey (with fifth and sixth floor level setbacks) over basement aparthotel comprising 159 no. studios/ suites resulting in 184 no. bedrooms and related aparthotel facilities including reception area, coffee and seating area, exercise room, guest laundry room, storage, administration and staff facilities, plant (including substation with associated switch room), waste storage area and delivery and dispatch area, with a total gross floor area of 6,619.13 sq.m (including basement of 470.8 sq.m). The development includes works to protect and conserve the existing railway arches with the areas under these integrated into the overall proposal, which includes for a change of use of these areas from car rental commercial use to aparthotel use (213.43 sq.m). The development will also include: vehicular and pedestrian access via Shaw Street and pedestrian access via Mark Street; 2 no. car parking spaces; cycle parking; associated lighting; associated site servicing (foul and surface water drainage and water supply); solar panels; the provision of SUDs measures, including attenuation tank and sedum roofs; garden and courtyards. The scheme also includes: all hard and soft landscaping; boundary treatments; changes in level; and all other associated site excavation and site development works above and below ground.

To find out more details on this Hotel & Guesthouse Development in Dublin Started on 2018-10-05 take the free trial here.


Address:
12-17 Mark Street

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL