PROTECTED STRUCTURE: The proposed development consists of a student accommodation facility (c. 8,834.5 sq.m GFA) with 48 no. student house units provided in 3 no. buildings as follows: Block A consists of a 3-4 storey building above ground fronting Montpelier Hill, containing 5 no. student house units and ancillary facilities to serve the development including a gym, common room, study, laundry, screening room, reception, staff facilities and management suite; Block B consists of a 3-5 storey over partial basement building to the rear of Block A towards the eastern site boundary containing 25 no. student house units, an ESB substation, customer switch room, basement plant room and caretaker room; Block C consists of a 3-4 storey building above ground to the rear of Block A towards the western site boundary containing 18 no. student house units; The proposed student house units comprise of 3 no. 4-bed units, 4 no. 5-bed units, 10 no. 6-bed units, 11 no. 7-bed units and 20 no. 8-bed units (total of 329 bed spaces). Each block will have roof access for maintenance purposes only; and all associated site development, boundary treatments and landscaping works including external amenity space at ground level, 110 cycle parking spaces at various locations throughout the site, bin storage facilities and a controlled pedestrian / cycle access from Montpelier Hill. The proposed development also includes the demolition of existing structures on the site (c. 2474.6 sq.m) including a 20th century building in the curtilage of No. 41 Montpelier Hill (a Protected structure) and boundary walls within the original curtilage of No. 55 Montpelier Hill (a protected structure).
To find out more details on this Residential Development in Dublin Started on 10th October 2017 take the free trial here.