Retention of materials recovery facility. The proposed development will consist of (a) retention of (1) an existing waste sorting building, (2) office building, (3) temporary workshop building, (4) weighbridge, (5) generator building, (6) electrics building, (7) vehicle wash area, (8) fire water holding tank and plant room, (9) skip storage area, (10) external waste processing area, (11) external construction and demolition (c&d) waste storage area, (12) foul and surface water tanks, (13) bored well and (b) permission for: (1) demolition of the existing waste sorting building (damaged by fire), office building and temporary workshop/store, (2) removal of the 3 no. Portacabins, (3) construction of an office building, (4) construction of a waste sorting building, (5) installation of a septic tank, (6) modifications to the existing access including the provision of entrance gates, and (7) all ancillary external storage of materials, parking, landscaping and site development works, no. Cha

To find out more details on this Office Development in Cork Applied for on 2018-10-10 take the free trial here.


Address:
Cullenagh

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL