1. Demolition of existing security hut and existing weigh bridge at existing hgv entrance loacated at the front of the site. 2. Provide new security hut and new weigh bridge located at back entrance to the site. 3. Construction of Production area extension 462m2, (Phase 3) to the Western side of existing production hall. 4. Construction of new mezzanine floor area (140m2 internal infill floor extension) over existing meat preparation area for new steam tunnel production lines. 5. Construction of new 75m2 first floor mezzanine area (linked to new steam tunnel production area) including installation of new goods lift. 6. Including provision of new parking spaces and all other associated site works.