Strategic Housing Development:
The proposed student accommodation development shall provide for 276no. bedspaces with associated facilities, a public house, 2no. commercial units and ESB Substation. The development will include the following:

(a) Demolition of existing Bakers Corner Public House approximately 1,378sqm

(b) Construction of a replacement public house of approximately 292.4sqm at the Kill Avenue Frontage with adjoining ESB substation (14.4sqm) and switch room (7sqm)

(c) Construction of a student accommodation development with an overall gross floor area of approx. 8,677 sqm (internal) in two blocks of 5 to 6 storeys (Bakers Corner Building – Building A) and 4 to 6 storeys (Main Student Accommodation Building – Building B). The development will provide for a total of 276 student bed spaces grouped into 38 no. clusters of six, seven and eight bedrooms with associated kitchen/dining/living areas

(d) Ancillary student support facilities are also proposed at ground floor level of the main student accommodation building (Building B), including: a common room/reception (169.2sqm), management office (16.2sqm), administration space (21.3sqm), Post/Comms area (15.4sqm) meeting room (41.6 sqm), store (18.6 sqm), canteen (22.5 sqm), Toilets and Shower Room (38.9 sqm), laundry (27.3 sqm), cinema room (43 sqm), gym (28.3 sqm), and break out space (45 sqm); and at fifth floor level 2no. communal lounges (27.5 sqm and 46.8 sqm(including Kitchenette)); totaling approx. 843.1 sqm.

(e) New Public/Urban Square with pedestrian routes, public seating, landscaped spaces and outdoor seating associated with commercial uses;

(f) The provision of communal lounges (12.2sqm each) on floors 1 to 4 of the Bakers Corner Building (Building A).

(g) The provision of 2no. commercial units (approx. 127.5 sqm and 273.3sqm) at the ground floor level fronting Rochestown Avenue in the Student Accommodation Building (“Building B”) and the Bakers Corner Building (“Building A”) respectively.

(h) The realignment of the existing car parking spaces to provide 34 no. car parking spaces (including 3 no. Accessible car parking spaces), 1 no. loading bay and 330 no. bicycle parking spaces at surface level and in secure stacked cycle parking store.

(i) Waste management area (24.8sqm) and plant room (60.9sqm) at ground floor level.

(j) Alterations to the existing vehicular and pedestrian entrances from Rochestown Avenue including the provision of a formalised pedestrian route, and the creation of a new pedestrian and cyclist entrance via Kill Avenue.

(k) Associated site and infrastructural works including the provision for water services, foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works including the provision of 3 no. roof terraces at fifth floor level (approx. 451 sqm, 150sqm and 60sqm sqm respectively); green roofs (97sqm and 142sqm), boundary treatments, electrical services and all associated site works.

To find out more details on this Residential Development in Dublin Granted permission on 2022-01-26 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL