Demolition of existing Public House building and of existing incomplete buildings on the east side of the site; construction of a three storey hotel comprising of 129 bedrooms, reception and ancillary bar (136sq.m) at ground floor, restaurant (311sq.m) in single storey building; associated waste storage to the west of the site; 3 three storey Aparthotel buildings comprising 15 units each (45 units in total) comprising of studios, one bed, two bed and three bed units to the south and south east; 3 small balconies with small terraces under on the north façade of the Aparthotel Block A & B and the west façade of Block C; new vehicular and pedestrian entrance at Boherboy/Saggart Road (L2008); new footpath along the Boherboy/Saggart Road (L2008); parking area for 120 cars and 30 bicycles; extensive tree planting throughout; substation together with all associated site works, boundary treatments and landscaping; total floor area of buildings is 8,313sq.m; existing vehicular entrance to the site on the Blessington Road will remain for emergency use only; An Ecological Impact Assessment is submitted as part of this application.

To find out more details on this Residential Development in Dublin Granted permission on 2021-05-24 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Mixed Development New Build in Dublin


Address:
The Former Embankment Site

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL