Permission for retention of works carried out on a phased basis including: (1) Provision of a revised entrance foyer and associated works on the northern side of the site (2) Extension of the bar area on the northern elevation at two number locations (3) Change of use and extension of a store room for use as a dining area (4) the extension of 2 number bedrooms at first floor level at the North Eastern corner of the plan (5) The provision of a passenger lift and associated lobby space and plant room on the northern elevation (6) Retention of all assoiated changes to the external elevations (7) retention and permission for all associated site development works. For Planning permission (8) Provision of cold rooms on the southern elevation (9) Alterations and additions of a door and side light in lieu of window at ground floor window at Southern elevation. And for planning permission (10) a traffic management scheme which allows for the provision of a one way system within the site entrance.

To find out more details on this Hotel & Guesthouse Development in Cork take the free trial here.


Address:
The West Cork Hotel

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL