Update 26/10/2018: It is expected that Intel will soon award a contract for site clearance and preparation.

*************************************************************

10 year permission for development comprising: Revised design and configuration of previously permitted manufacturing building Planning Reg Ref 12/435 – PL09.241071, over four levels (parapet height of 31m) with a total floor area of 88,740sqm including support areas and roof mounted stacks and equipment ranging in height from 6m to 24m above parapet. Revised design and configuration of previously permitted utility support buildings consisting of: (i) a two level boiler and chiller building and associated roof mounted cooling towers sized 3,808sqm X 18.5m high; (ii) a two level water treatment building sized 2,375sqm X 11.7m high; (iii) a two level waste water treatment building sized 2,407sqm X 14.8m high and a single level water purification building sized 247sqm X 9m high.

To find out more details on this Factory Development in Kildare Started on 2019-01-02 take the free trial here.


Address:
Collinstown Leixlip Blakestown Kellystown

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL