Erect & install 6 floodlight columns each 21.34m with associated floodlights in each column (with 10 lighting fixtures in each of the four corner installations and 13 lighting fixtures for the two remaining columns) on pre-cast foundation each of 1.07m approximately underground with 0.61m visible above ground of 400mm diameter on each column to provide light levels of 500 lux horizontal, over a period of September through to April inclusive only. Associated control gear to provide on/off control and monitoring of lighting system, electrical works, including connection to the national electricity supply network, low level lighting along an existing path adjacent to the floodlit pitch and associated site works.

To find out more details on this Sport & Leisure Development in Dublin take the free trial here.


Address:
Pitch 4

Stage:
Plans Refused


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL