Permission for: Demolition of 9.5m2 of single storey extension, located to the rear of the Novitiate (Management House); Removal of internal lift enclosure and landings from the modern Proby House atrium, serving The Novitiate; Removal of selected internal partition walls, fittings and services and reinstatement of existing Level 1 opening within the Novitiate; Change of Use from educational to dining/servery use at first floor (Level 2) of Liquori House; Change of Use from student residential accommodation to educational and dining use at first and second floor levels (Levels 2 and 4) of The Novitiate; Construction of new 5.5m2 external lift enclosure adjoining the rear of Proby House atrium serving The Novitiate, with new first floor level stair connection across atrium to Liguori House; Construction of new 9.5m2 single storey lobby/office extension adjoining Proby House residences to the rear of The Novitiate; Refurbishment and alterations to Liguori House at first floor level (Level 2) to include new opening in lobby wall and provision of a new servery and dining area with associated mechanical/electrical services and other minor alterations; Refurbishment and alterations to three floor levels of The Novitiate (Management House) for new educational and ancillary office/dining spaces including minor structural upgrades, new partitions, sanitary provisions and upgrading of fire and acoustic linings to floors, walls and ceilings and associated mechanical/electrical services; Associated minor external drainage and services alterations adjacent to The Novitiate (Management House) and Proby House residences together with minor site works and landscaping and amendments to existing external lighting.
To find out more details on this School Development in Dublin Started on 2016-06-23 take the free trial here.