Remove existing palisade fence c. 175 linear metres, demolish existing security hut and maintenance shed (circa 1650m.sq) and for the construction of a new maintenance shed (total floor area 1990m.sq) on a site of 2.84 ha. and ridge height of 8.184m. The unit will consist of a warehouse internal area (1334m.sq.) ; ancillary office and toilet accommodation total area of 656m.sq. at ground and first floor level; Roller shutter doors (6 No.); Construction of new security hut (16.2m.sq. and ridge height of 4.225m); Provision for 50 car parking spaces; provision of an ESB substation and switch room, wheel wash area, weighbridge, underground diesel tanks, modifications to existing site entrance inclusive of new set back piers and gates and construction of a new 2.4m high timber fence c. 130 linear metres, installation of foul water treatment plant with percolation area and intensive landscaping/associated site works on this site.

To find out more details on this Light Industrial Development in Dublin Started on 2015-09-23 take the free trial here.


Address:
Ballyhack

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL