A ten year duration for a proposed two wind turbine development. The development will consist of the construction of two wind turbines comprising tower, nacelle and composite fibre rotor blades with a hub height of up to 78 metres, a rotor blade diameter of up to 82 metres, and thus a blade tip height of up to 119 metres with a steel tower with concrete section. The proposed development also includes external wind turbine transformers, turbine foundations, hardstands and assembly areas; new access tracks; and use of approved access track and access permitted under planning permission reference 10/70075 for an adjacent wind turbine; electrical control building; associated drainage works; underground electrical cable and associated communication cables; with all ancillary development and associated site works.

To find out more details on this Power Generation Development in Donegal Granted permission on 9th March 2017 take the free trial here.


Address:
Stranaclea & Meenkeeragh

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL