consist of a mixed-use development including: 99 No. residential units in the following composition:
– 59 no. Houses (14 No. 2 bed, 37 No. 3 bed and 8 No. 4 bed) with heights of two storey (53 No.) and bungalows (6. No.) in a mixture of 2 No. Detached, 20 No. Semi-detached and 37 No. terraced.
– 36 No. duplex apartments are proposed in 4 No. three storey blocks (18 No. 3 bed and 18 No. 2 bed).
– 4 No. bed apartments (all 3 bed) in the existing first floor modern extension of the protected structure. In the protected structure the following change of use is proposed.
– The villa house is proposed to be used as a crèche (495 sqm) over two storeys and will extend into the existing modern extension.
– The chapel is proposed as a community use (237 sqm) and will extend into the existing modern extension which will include toilets and a tea station. In the existing modern extension of the protected structure, the following change of use is proposed.
– A retail unit (55 sqm) at ground floor.
– A cafe (113 sqm) at ground floor.
– A GP/medical practice (110 sqm) at ground floor.
– 4 No. own door craft manufacturing units are proposed (total 160sqm) at ground floor.
– ESB plant (25 sqm), access lobbies, lift and ancillary at ground floor.
– 1 No. office unit (136 sqm) at first floor.
– 4 No. apartments (all 3 bed) are proposed at first floor.
The application also proposes the following:
– New vehicular access from Convent Road.
– Provision of pedestrian and cycle connections.
– Demolition of bungalow and outbuildings (total 453 sqm)
– Balconies are proposed to be erected for use of 4 No. apartments on the existing extension to Protected Structure.
– Minor works to Protected Structure and existing extension to facilitate proposed uses and fire escape.
– Change of use of Gate Lodge to management office (24 sqm).
– The development includes site clearance, private, communal and public open space, landscaping including enhancement of stream, removal of walls, new boundary treatments, 212 parking spaces, ESB kiosk, lighting, play areas, cycle spaces, site drainage works and all ancillary site development works above and below ground.
To find out more details on this Residential Development in Wicklow Granted permission on 2021-12-07 take the free trial here.