The construction of a car showroom building with a total floor area of 1638 m2 comprising of showroom area, workshop area, parts reception, parts store, canteen, offices, comms room, toilet areas, tool room, parts room, electrics room and boiler/compressor room at ground floor level with toilet area, canteen and parts store at first floor level. Ancillary site works to include a new internal access road, construction of surface water drainage system and foul drainage system with connection to public storm and foul sewers. Installation of 94 no. car parking spaces, refuse area, footpaths, landscaping and boundary treatments. Installation of building and main ID signage. Provision of temporary vehicle storage area compound during construction of the new car showroom building.

To find out more details on this Car Showroom Development in Westmeath Started on 2017-05-18 take the free trial here.


Address:
Lynn Road

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL