For development which will consist of a new two storey primary school building with a gross floor area of approx. 2535m2 accommodation consists of 16 classrooms, a general purpose room. A library/resource room, and ancillary accommodation in addition, the re-location of the existing gated vehicular entrance and a new gated vehicular and a pedestrian entrance is proposed off the knockanean road boundary, serving 24 no. On site car parking spaces and associated set down areas, pedestrian pathways together with 2 bail courts, play areas, a bin store, a bicycle shelter, 3 no. Flagpoles, connection to existing foul drainage treatment system, separate surface water drainage, signage, landscaping and all associated site works on an overall site area of 1. 34 hectares.

To find out more details on this School Development in Clare take the free trial here.


Address:
Knockanean

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL