Extension of Duration: Construction of wind farm, consisting of 15 wind turbines of up to 3mw capacity each of up to 85m hub height and up to 100m blade diameter with a total height not exceeding 135m, a permanent meteorological logical lattice mast 85m high, a substation and associated equipment, a borrow pit, internal site tracks, site drainage and associated works.
To find out more details on this Power Generation Development in Donegal Granted permission on 13th February 2014 take the free trial here.

