(1) Change of use of part of existing warehouse area to front of existing building to new three storey office area and construction of new internal link corridor to existing Admin Building (2) Construction of a new high level glazed walkway between original Cameron Building and former B3 Wessel Cable building (3) Changes to the front elevation including replacement of cladding with Architectural Panel, provision of new windows, doors and glazed curtain wall entrance along with proposed new parapet along entire front elevation (4) Relocation and provision of new external pedestrian doors and new roller shutter doors on east and west elevations (5) To provide signage to front of building (6) Retention for location of existing water sprinkler tank to rear of site

To find out more details on this Office Development in Longford Started on 2014-11-17 take the free trial here.


Address:
(Former B3 Wessel Cable Building)

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL