Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development.
To find out more details on this Factory Development in Dublin Granted permission on 21st October 2021 take the free trial here.