7th February 2022
Commencement of Phase 2 of 2 Block B & C & development site : Block B consists of a part 6/ part 9 storey block comprising of apartments, residential amenities and retail units.Block C consists of an 8 storey block comprising a crèche & apartments at 5A-C Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
The development will consist of:
Demolition of the existing 2,590sq.m industrial building and the construction of a ‘build-to-rent’ housing development providing a total of 196 no. residential apartments (comprising 45 no. studio units, 48 no. one-bed units, 8 no. two-bed (3-person) units and 95 no. two-bed (4-person) units) in 4 no. six-nine storey blocks over basement. The development will include 1 no. commercial unit (248sqm, accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001 – 2018) at ground floor level, 1 no. office unit (111sqm) at ground floor level; a crèche (192sqm) at ground floor level; a gym (18sqm) at ground floor level; 6 no. communal amenity spaces provided at ground and first floor levels across the development (totalling 286sqm); a communal hot desk room (25sqm) at ground floor level; and 3 no. communal secure storage areas (totalling 31sqm) at ground floor level; along with a ground floor level landscaped courtyard, 408 no. bicycle spaces (308 no. resident spaces at basement level and 100 no. visitor spaces at ground floor level); an underground carpark (accessed from Second Avenue, providing a total of 67 parking spaces (including 61 no. standard spaces and 6 no. mobility impaired user parking spaces)) and refuse/waste/recycling stores. Associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB Substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
https://www.pleanala.ie/en-ie/case/303803
To find out more details on this Residential Development in Dublin Started on 2022-02-07 take the free trial here.