1. Demolition of the existing bungalow on site.
2. Construction of 18 no. Houses comprised as follows:
(a) 5 no. Three storey, terraced houses (3 no x4 bed and 2 no x3 bedroom, all fronting onto main street.
(b) 13 no. 4 bedroom, two storey houses on their own sites located behind the street facing terrace (10 no. X semi-detached and 3 no. X detached)
3. Remodelling and widening of the existing vehicular entrance to the site to accommodate the new development.
4. Removal of one of the existing mature trees on main street to provide proper sight lines at the vehicular access. 5. New drainage connections to public foul and surface water mains as well as all associated and ancillary site and ground works.
To find out more details on this Residential Development in Kildare Granted permission on 31st July 2019 take the free trial here.