Development consisting of the following: – (1) change of use & amalgamation of existing units 10, 11, 12 & 13 from warehouse & office space to light industrial unit which will be used to manufacture plastic products (floor area = 2293m2); (2) to carry out alterations to elevations of existing building; (3) provision of first floor office space in existing building with additional floor area of 231m2; (4) construction of an extension to side elevation with additional floor area of 266m2, provision of 6 no Silos for raw material storage each with a capacity of 99.7m3, a rain water harvesting tank and water chiller; (5) relocation of existing site entrance and construction of new boundary walls and fencing; (6) revised car parking layout and provision of loading bays; (7) signage & 3 no flag poles and (8) to carry out ancillary site development works.
To find out more details on this Light Industrial Development in Sligo Granted permission on 4th February 2015 take the free trial here.