The proposed amendments include the following: (i) Provision of an additional sub-basement area of 1,025 sq.m gross floor area (GFA) to accommodate a gym ancillary to the permitted office use, and plant room areas, and details of attenuation tank provided; (ii) omission of two previously permitted entrances and the creation of a single central entrance and foyer and associated elevation amendments; (iii) increased building setback along the south-east elevation and increased terrace area at lower ground floor level and consequential elevation amendments to the south-east elevation; (iv) Omission of the two previously permitted cores and provision of one central core. Omission of the permitted single atrium and replacement with two atriums either side of the central core. All associated amendment at each floor level as a result of the alterations to the atrium and cores; (v) alterations to the internal layout of the lower basement; (vi) Alterations to the south-west , north-east

To find out more details on this Office Development in Dublin Started on 2017-05-08 take the free trial here.


Address:
Burlington House

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL