Permission is sought for proposed changes to Main Centre – The extension and amalgamation of retail units 2/2 and 2/3 at Level 2 to create one retail unit and the extension of the mezzanine retail floor space of unit 2M/2 at Level 2M, which together will create new Unit 2/2 (863.5sq.m) – The subdivision of existing unit 2/3 (now unit 2.2 as above) on level 2 to create a new unit accessed from Building 9 and change of use from retail to leisure use of the newly formed unit referred to as Unit CSC 2.3 (662.8sq.m) – the removal of fire-escape staircase between existing retail units 2/3 and 2/4 on level 2 and the creation of a new retail unit 2/3.1 (23.1sq.m) – The provision of a new fire-space corridor accessed from the mall at level 2 – The extension of existing unit 2/4 at level 2 and the extension to the mezzanine retail floor space at retail unit 2M/4 on level 2M to create Unit 2/3 (634.9sq.m). This new/extended Unit 2.3 will result in elevational changes to the eastern (Ridgeford) elevation of the main centre – Removal of staircase between levels 1 and 2 and creation of a restaurant/cafe at Level 1 known as Unit 1/11A (38.6sq.m) and a restaurant/cafe area on Level 2 known as Unit 2/3.2 (112.8sq.m). Proposed elevational changes to Building 9: – Elevational changes to the exterior of the cinema foyer including extension to lobby area (45.4sq.m) at Level 1 only, and all associated site and development works.

To find out more details on this Retail Development in Dublin Granted permission on 2018-08-02 take the free trial here.


Address:
Units 2/2, 2/3, 2/4 On Level 2 & Units 2M/2, 2M/3 & 2M/4 On Level 2M

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL