Dwyer Nolan Developments Ltd. intend to apply to An Bord Pleanála for permission for a strategic housing development, on a site of c. 1.5 hectares, located at the junction of Santry Avenue and Swords Road, Santry, Dublin 9. The development site is bounded to the north by Santry Avenue, to the east by Swords Road, to the west by Santry Avenue Industrial Estate, and to the south by the permitted Santry Place development (granted under Dublin City Council Ref’s. 2713/17 & 2737/19).

The proposed development provides for 350 no. apartments, comprised of 113 no. 1 bed, 218 no. 2 bed, & 19 no. 3 bed dwellings, in 4 no. seven to fourteen storey buildings, over basement level, with 5 no. retail / commercial units and a community use unit located at ground floor level facing onto Santry Avenue and Swords Road. A one storey residential amenity unit, facing onto Santry Avenue, is also provided for between Blocks A & D.

The development consists of the following:

Demolition of the existing building on site i.e. the existing Chadwicks Builders Merchants (c. 4,196.8m2).
Construction of 350 no. 1, 2, & 3 bed apartments, retail / commercial and community uses in 4 no. buildings that are subdivided into Blocks A-G as follows:

Block A is a 7 to 14 storey block consisting of 59 no. apartments comprised of 26 no. 1 bed & 33 no. 2 bed dwellings, with 2 no. commercial/retail units located on the ground floor (c. 132.4m2 & 173m2 respectively).
Adjoining same is Block B, which is a 7 storey block consisting of 38 no. apartments comprised of 6 no. 1 bed, 20 no. 2 bed, & 12 no. 3 bed dwellings, with 2 no. commercial/retail units located on the ground floor (c. 162.3m2 & 130.4m2 respectively). Refuse storage areas are also provided for at ground floor level.
Block C is a 7 storey block consisting of 55 no. apartments comprised of 13 no. 1 bed & 42 no. 2 bed dwellings. Refuse storage areas are provided for at ground floor level.
Adjoining same is Block D which is a 7 to 10 storey block consisting of 51 no. apartments comprised of 25 no. 1 bed, 19 no. 2 bed, & 7 no. 3 bed dwellings, with 1 no. commercial unit / café located on the ground floor (c. 163.3m2). A refuse storage area is also provided for at ground floor level.
Block E is a 7 to 10 storey block consisting of 58 no. apartments comprised of 10 no. 1 bed & 48 no. 2 bed dwellings, with 1 no. community use unit located on the ground floor (c. 188.1m2). A refuse storage area, substation, & switchroom are also provided for at ground floor level.
Adjoining same is Block F which is a 7 storey block consisting of 55 no. apartments comprised of 13 no. 1 bed & 42 no. 2 bed dwellings. A refuse storage area & bicycle storage area are also provided for at ground floor level.
Block G is a 7 storey block consisting of 34 no. apartments comprised of 20 no. 1 bed & 14 no. 2 bed dwellings. A refuse storage area & bicycle storage area are also provided for at ground floor level.
Construction of a 1 storey residential amenity unit (c. 187.9m2) located between Blocks A & D.

Construction of basement level car parking (c.5,470.8m2) accommodating 173 no. car parking spaces & 719 no. bicycle parking spaces. Internal access to the basement level is provided from the cores of Blocks A, B, C, D, E, & F. External vehicular access to the basement level is from the south, between Blocks B & C. 36 no. car parking spaces & 58 no. bicycle parking spaces are also provided for within the site at surface level.
Public open space of c. 1,915m2 is provided for between Blocks C, D, E, & F. Communal open space of c. 3,122m2 provided for between (i) Blocks E, F, & G, (ii) Blocks A, B, C, & D, and (iii) in the form of roof gardens located on Blocks A, C, & F and the proposed residential amenity use unit. The development includes for hard and soft landscaping & boundary treatments. Private open spaces are provided as terraces at ground floor level of each block and balconies at all upper levels.

Vehicular access to the development will be via 2 no. existing / permitted access points: (i) on Santry Avenue in the north-west of the site (ii) off Swords Road in the south-east of the site, as permitted under the adjoining Santry Place development (Ref. 2713/17).
The development includes for all associated site development works above and below ground, bin & bicycle storage, plant (M&E), sub-stations, public lighting, servicing, signage, surface water attenuation facilities etc.

The application contains a statement setting out how the proposal is consistent with the objectives of the Dublin City Development Plan 2016-2022, and also contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.

To find out more details on this Residential Development in Dublin Applied for on 2021-07-22 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
At the junction of Santy Avenue and Swords Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL