The development will comprise of (1) 13 two storey dwellings in three blocks (Block A – terraced comprising of 2 no. 2 bed and 2 no. 3 bed dwellings, Block B – terraced comprising of 2 no. 2 bed and 2 no. 3 bed dwellings, block C – terraced comprising of 3 no. 2 bed and 2 no. 3 bed dwellings) 92) A two storey retail and office building of gross floor area 1102.4 sq.m (Block D) (3) A Single storey convenience store of gross floor area 493.55 sq.m (Block E) (4) A single storey montessori school of gross floor area 178.1 m sq (Block F), (5) Site development works comprising of a new entrance, internal roads and pavements, car parking, landscaping and infrastructural works to include connection to services to facilitate the development.

To find out more details on this Residential Development in Tipperary Granted permission on 2014-04-10 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Mixed Development New Build in Tipperary


Address:
Garryshane

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL