Construction of two wind turbines comprising towers, nacelles and composite fibre rotor blades with:one turbine at a hub height of up to 85 metres, a rotor blade diameter of up to 82 metres, and thus a blade tip height of up to 126 metres with a steel tower with concrete section; and the other wind turbine having a hub height of up to 55 metres, a rotor blade diameter of up to 44 metres, and thus a blade tip height of up to 77 metres with a steel tower. The proposed development also includes external wind turbine transformers; single storey substation control building ; turbine foundations, hardstands and assembly areas with drainage , new access tracks and improvements, upgrade of existing tracks, use of existing site entrance; associated drainage works, including drainage channels, drainage crossing and silt traps along the access tracks; underground electrical cables and associated communication cables; and all ancillary development and associated site works.

To find out more details on this Power Generation Development in Donegal Started on 23rd April 2018 take the free trial here.


Address:
Bauville, Keelogs, Clonglash, Druminderry Upper and Lower Townlands

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL