(a) Extend the existing roof structure over an existing portion of the un-covered dry dock unit, (b) increase the overall height of the structure covering the dry dock unit, (c) construct an extension to the Western elevation covering over an existing external work space associated with the dry dock unit, (d) construct a two storey extension to the Eastern elevation hosing trades associated with ship maintenance also to include all associated site works

To find out more details on this Factory Development in Cork take the free trial here.


Address:
Ballynakilla

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL