The development will consists of :
a) demolition of existing single-storey montessori /creche building and store;
b) construction of apartment block, part 3 storey and part 4 storey over basement,comprising of 30 no. apartments (16 no. one bedroom units and 14 no. two bedroom units) all with private balconies/terraces;
c) removal of existing boundary wall and closing two no. vehicular entrances from Huntstown Way, erection of new low level stone wall and railing to boundary along Blakestown road and Huntstown Way, forming new vehicular entrance from Blakestown and new pedestrian entrance from Huntsman Way;
d) provision of 7 no. car parking spaces at ground level and 17 no. car parking spaces at basement level together with plant room, storage and ancillary facilities;
e) two no. bicycle stores at ground level with provision for 42 no. bicycles, also provision for 9 no. bicycles at basement level;
f) bins storage compound at ground level;
g) lanscaping and amenity open space boundary treatments and all associated site works necessary to facilitate the development.

To find out more details on this Residential Development in Dublin Applied for on 2021-12-17 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
Junction Of Blakestown Road & Huntstown Way

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL