26-11-2018 Main Contractor (Sisk) starts construction.

Development of an enterprise centre on a site of 0.09 hectares approximately. The development will consist of the: demolition of the existing part two-storey, part single-storey light industrial warehouse building (1,431 sq. M gross floor area) and its replacement by construction of a four-storey over two-level basement enterprise centre building (with set-back second and third floor levels) 3,785 sq. M gross floor area (including two basement levels of 1,428 sq. M gross floor area) accommodating: shared workspace over basement -1 to third floor levels; reception; cafe / collaborative work-space; a roof terrace to the west elevation on the roof of the First Floor Level; landscaped courtyards at Basement -1 Level to the south of the building and at Ground Floor Level to the north of the building. The development will also consist of the provision of : privacy screens to the northern and southern elevations; a bicycle lift accessed via Barrow Street; bicycle parking (38 no. spaces); shower rooms; tenant storage. plant rooms at Basement -2 Level and a plant enclosure at roof level including lift over-run; waste compound/ store; SuDS measures including attenuation tank and green roofs; flood defence systems and associated storage; all hard and soft landscaping; elevational treatments; lighting; signage; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply).

To find out more details on this Office Development in Dublin Started on 2018-06-18 take the free trial here.


Address:
15 Barrow Street

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL