The construction of a 2 storey external utilities piperack extension enclosed with a full height perforated mesh screen at the second and third floor levels to the west, a 3 storey external utilities piperack extension enclosed with a full height perforated mesh screen at first, second and third floor to the east and an enclosed 4 storey access stairwell extending from ground level to third floor level to the east of the existing organic synthesis plant 1 at production facility. The proposed development is covered by an existing industrial emissions licence no. P0013-14. The development refers to a modification to an establishment to which the major accident directive applies.
To find out more details on this Factory Development in Cork Granted permission on 6th August 2019 take the free trial here.

