19 Jul 2021 Construction commenced of Phase 1 of a multiple housing development Farmleigh Woods consisting of 4 no detached houses, 6 no semi-detached houses & 1 duplex block containing 4 units.
Construction of 47 mixed type housing units to include (1) 7 no. Two storey, 4 bedroom detached houses with attic utilisation (2) 16 no. Two storey, 5 bedroom semi-detached houses with attic utilisation (3) 4 no. 2 bedroom, ground and first duplex apartment units in two storey buildings (4) 10 no. 2 bedroom ground floor duplex apartment units in two and a half storey buildings (5) 10 no. 3 bedroom two storey duplex apartment units in two and a half storey blocks (6) development of estate roads, footpaths and open grassed and play areas, all with vehicular and pedestrian access via the farmleigh park road onto the old laghey road (l-2065-1) and all associated site development works, including construction of boundaries, retaining structures, storm water drainage and attenuation with discharge into the existing pipe network, foul water drainage and connection into the existing mains pipe network, mains water supply pipes and all associated public lighting, public utility networks service
To find out more details on this Residential Development in Donegal Started on 2021-07-19 take the free trial here.