Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the nearby ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units) up to 11 transformer and inverter units including access tracks and site entrance along existing roadway associated electrical cabling and ducting security gates, 2.6m palisade perimeter security fencing CCTV system landscaping works and all other associated ancillary infrastructure.
To find out more details on this Power Generation Development in Roscommon Applied for on 15th November 2024 take the free trial here.