9 Jul 2025 An Bord Pleanala Grant Permission with Conditions

The Proposed Project will comprise the following key elements:
• Regional Wastewater Treatment Plant (WwTP), of 500,000PE capacity to be located on a 29.8ha site in the
townland of Clonshagh in Fingal;
• Sludge Hub Centre (SHC) to be co-located on the same site as the Regional WwTP;
• A 13,700m length Orbital Sewer from Blanchardstown to the WwTP, including an Odour Control Unit at
Dubber;
• A 600m connecting sewer from the North Fringe Sewer (NFS) to the WwTP;
• Abbotstown Pumping Station to be located in the grounds of the National Sports Campus on a 0.4ha site;
• An 11,300m length Outfall Pipeline from the WwTP to the outfall point approximately one kilometre northeast of Ireland’s Eye;
• Regional Biosolids Storage Facility (RBSF) to be located on a 11ha site at Newtown in Fingal;
• Access Road from existing R139, and new egress point onto the Clonshaugh Road; and
• All associated construction compounds and ancillary work areas.

To find out more details on this Water & Sewerage Development in Dublin Granted permission on 9th July 2025 take the free trial here.


Address:
Townlands of Clonshagh, Dubber and Newtown

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL