The development that will consist of: A 10-year permission for the development of a solar farm on a site of 63.4 hectares consisting of the following: 301,000 sqm of solar photovoltaic panels on ground mounted steel frames; 10 hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts; a new access from the L1219 public road; access gates; landscaping and biodiversity enhancement measures; security gates; boundary fencing and all associated ancillary development, site works and services. Installations of internal network cable to facilitate a future under-the fence connection from an on-site transformer compound to the existing Rathkeale 110kV substation which is located adjacent to the site. The on-site transformer compound will enclose an Independent Power Producer Building of 30.8 sqm, a 110 kV transformer, an 18 m high lightning monopole mast, and associated ancillary development. The solar farm will be operational for 40 years.

To find out more details on this Power Generation Development in Limerick take the free trial here.


Address:
Ardgoulbeg

Stage:
Plans Refused


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL