The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.

To find out more details on this Power Generation Development in Dublin Started on 22nd October 2024 take the free trial here.


Address:
Cheeverstown Townland

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL