The demolition of existing agricultural structures and construction of a central gas injection facility within a site area of ca. 1. 8ha, comprising of; a concrete apron; 16 no. Truck bays, a welfare/office facility; medium voltage substation; 8 no. Pressure reduction skid units; 2 no. Boiler units; network entry facility unit; flare unit; odorant injection unit; propane storage; compressed natural gas refuelling area, electrical and instrumentation kiosk; generator kiosk; transformer kiosk; 8 no. Compressor container units; 4 no. Gas chromatograph units; covered shelter for storage of gas bottles; compressed natural gas dispenser; compressor building; on site drainage; underground pipework; 1 no. New site entrance from the n73 and associated drainage to serve the proposed facility nad adjacent existing corracunna above ground installation facility and the removal of the existing corracunna above ground installation entrance and ; all associated site development works. The major accide
To find out more details on this Power Generation Development in Cork Started on 29th October 2024 take the free trial here.