Development will consist of 10 year planning permission for the construction of a 1. enclosed battery energy storage system compound on a total of up to c. 2.63 hectare site which will be located in the the townland of Silloge, c. 5km north of the settlement of Navan, Co. Meath and will consist of the following elements:
• 1 no. Substation Compound, Substation Building and associated electrical equipment;
• 35 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units);
• transformer and inverter units;
• including access tracks and site entrance along with upgrade words on the public roads (c.450m);
• associated electrical cabling and ducting;
• security gates and c. 2.6m palisade perimeter security fencing;
• CCTV system;
• landscaping works;
• and all other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of areas of hard standing including a maintenance lay-down area;
• c.110m of underground cabling ducts and cable to the neighbouring ESB substation.
To find out more details on this Power Generation Development in Meath Granted permission on 21st February 2024 take the free trial here.