Install a Liquefied Natural Gas (LNG) Plant Compound, with a 200m3 horizontal tank with 2 no. associated ambient vaporisers, regulation station, control room including unloading area, all other associated ancillary site works and landscaping. Planning Permission for the LNG Plant has been previously granted at a location external to the site under ABP-308495-20. The current Application aims to replace the previous permission construct the LNG Plant Compound within the existing site boundary and reduce storage of the LNG on site, which was previously granted for an LNG Plant Compound with 2 no. 131m3 horizontal tanks. A Natura Impact Statement (NIS) will be submitted with this Application. The existing Development has an IEL Licence issued by EPA. The site is listed under the Major Accidents Directive (a Serveso Site).
To find out more details on this Power Generation Development in Cavan Applied for on 23rd January 2025 take the free trial here.

