The development will consist of: The installation of ground mounted Photovoltaic Panels with a maximum output of 1000 kWp (Kilowatt peak) distributed over grassed areas on a site size of 1.70 Ha with all associated site works.

To find out more details on this Power Generation Development in Mayo Granted permission on 4th April 2025 take the free trial here.


Address:
Friarsquarter West

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL